| | Home > Chinker's Edge Chinking - 5 Gal.
Sashco Chinker's Edge ChinkingAre you looking to chink a restored log home, or to achieve a more vintage look in a new log home or structure? With more surface texture than most other log chinking products, Sashco Chinker’s Edge Chinking provides a true historical look, high quality, and excellent performance. Sashco Chinker’s Edge Chinking is easy to apply, making it perfect for the professional log home builder or the do-it-yourselfer.
Sashco Chinker’s Edge Chinking Features and Benefits:
- Developed and tested by professional log chinkers
- Water based, and easy to apply
- Available in five colors, paintable with oil or latex stains after just one week of curing
- Fast curing—1-4 hours to water resistant skin, tack free in 30 minutes
- Compatible with most sealers and preservatives
- Excellent elasticity, long lasting and durable
- Requires less water for tooling, making cleanup easier
- 10 year warranty, Limited Lifetime Warranty when used with Sashco stains
- Available in 5 gallon pails or 29 oz cartridges.
Sashco Chinkers Edge Chinking Coverage Rates (per 5 Gallon Bucket of Chinking:)
- ½'' x 1'' Wide Chinking Joint= 195 Lineal Feet
- ½'' x 2'' Wide Chinking Joint= 95 Lineal Feet
- ½'' x 3'' Wide Chinking Joint= 65 Lineal Feet
- ½'' x 4'' Wide Chinking Joint= 45 Lineal Feet
Applying Chinkers Edge
Applying Chinker's Edge
Proper substrate preparation and application are imperative for
product longevity. Read this entire label and the Data Tec sheet,
CHE 002, before applying any product.
If you do not have this
Data Tec sheet, call us at 719 547 2135 and we will be happy to provide it.
- Best results are obtained when Chinker’s Edge is applied to
clean, dry, stained wood. Make certain there is compatibility
between your stain and Chinker’s Edge. Call Western Log Home Supply for guidance
if in doubt.
- Check the weather forecast. Finishing products are best applied
in moderate weather conditions, i.e., out of direct sunlight, dry
conditions and warm.
- Check the log surface temperature. The ideal application range is
between 50-90°F.
- Install a bond breaker, either backer board or backer rod,
depending on the style of log, to provide 2-point adhesion.
Chinker’s Edge is especially well suited for use on white styrene
bead-board. We do not recommend the use of blue or pink
styrene board.
- If backer board is being used, tape the entire joint with either
mylar or duct tape.
- Gun the chinking over the backing material. Ideal sealant depth
is 1/2 of the joint width, but no less than 1/4”, nor more than
1/2”.
- Tool Chinker’s Edge to ensure good contact with the log surfaces,
especially to the upper log; this will greatly aid adhesion.
- All chinking products may occasionally “blister”.
To avoid blistering:
Do not apply in direct sunlight.
Protect from direct sunlight for 1-2 days after
application with white plastic sheeting tacked
over the fresh chinking.
Surface Preparation
Best results are obtained when Chinker’s Edge
is applied to wood that has been previously coated
with a compatible stain. If newly stained, the
stain should be thoroughly cured before Chinker’s
Edge application. If the stain is older but still
intact, clean the log surfaces thoroughly to
remove dirt, pollen, bird droppings and other surface
contaminants.
The USDA Forest Products Laboratory and
other researchers around the world have recently
reported that surface wood exposed to sunlight
for as little as 1-2 weeks can become significantly
damaged and unsound which may lead to premature
adhesive failure of coatings. Such surface
wood damage has the potential to, also, harm
adhesion. So, once bare wood has been properly
cleaned and prepped to remove unsound wood,
Chinker’s Edge should always be applied as soon
as possible.
Some coatings that contain high levels of wax
must only be applied after Chinker’s Edge has
been applied and allowed to cure. Additionally,
coatings that are based on non-drying oils, like
motor oil, should never be used in combination
with Chinker’s Edge—neither before nor afterwards—
since such oils can migrate to the bondline
and destroy adhesion. We maintain a list
of some of the treatments, which should be
applied after applying Chinker’s Edge, making
sure Chinker’s Edge is thoroughly cured.
Sashco can also test the compatibility of stains.
Please allow a minimum of 6 weeks for testing.
Call Sashco for more information.
If a stain is applied over Chinker’s Edge, it
will be tinted the stain color, but will be affected
differently than the surrounding wood. Test
appearance before widespread use.
Methods of Application
When using 5-gallon pails, use the patented Snorkler
Pumping system, grout bags or bulk loading guns may be used.
Although Chinker’s Edge is freeze-thaw stable, it will dispense
easier when it is kept warm before use.
When using a cartridge, cut the spout at a 45° angle to desired
bead size. In wider joints, multiple beads may need to be run until
the entire joint is filled with chinking.
Round Logs: To use a foam brush, work the material smooth
with a damp brush, keeping a rag handy to pick up drips of water
and excess Chinker’s Edge.
Square Logs: Use a putty knife to strike off excess of
Chinker’s Edge, making the joint level with the logs. Use a damp
foam brush to smooth the material, keeping a rag handy to
absorb drips and wipe off excess Chinker’s Edge.
Not only do these techniques give an aesthetically pleasing
chinking line, they also ensure a proper seal between the
Chinker’s Edge and the log surface.
Applying Chinker's Edge to Slab Siding
Slab siding can pose a special challenge due to the very rapid
and large amount of movement it often exhibits after being
installed. This movement shows up as extreme shrinkage, bowing
and twisting, and can stress sealants more than logs do. To best
help reduce this problem, the slab siding should be installed with
heavy screws, rather than with nails. Use dry slab siding, and verify
moisture level with a moisture meter.
- Start with clean wood that has already been treated with a preservative
and stain compatible with Chinker’s Edge. We recommend
PeneTreat as a preservative and either
Capture/Cascade or High Sierra Log Stain. The coated wood
should also be well cleaned immediately before the Chinker’s
Edge is applied.
- It used to be possible to apply chinking directly to Tyvek™
house-wrap, but with recent changes made to this house-wrap
product, this is no longer true. So, mylar or duct tape should be
applied to wrinkle-free Tyvek™ wrap before Chinker’s Edge is
applied. Wrinkles left in the wrap will “telegraph” or show
through.
- If the boards are thick enough to install backer rod, we recommend
that Half Rod™ backer rod be used with the round portion
of the profile facing out from the building.
- Apply Chinker’s Edge by use of trowel, grout bag, bulk loading
gun, pre-loaded cartridges, or commercial machinery, such
as the patented Snorkler Pump.
- The width of the contact surface of the Chinker’s Edge on the
edges of the siding should not be less than 3/8" (to insure good
adhesion) — and the Chinker’s Edge should be firmly tooled
for good contact with the top and bottom siding boards.
- Don’t forget to chink or caulk (with Chinker’s Edge, Log
Builder or Conceal) the butt joints where moisture could otherwise
gain entry in driving rains.
NOTE: Ideal joint design allows
for the chinking to form an hour
glass shape, as in this drawing,
with the half rod backer material.
Some slab siding underg o e s
extreme shrinkage which can
lead to some early-on maintenance
of the chinking.
Clean-up and Disposal
Dispose of Chinker’s Edge in accordance with
local regulations. Do not dispose of in drinking
water supplies.
Hands, surfaces and equipment may be
cleaned-up with water.
Warning: Blisters May Occur
Blisters are a phenomenon commonly found in
the caulking and sealant industry. They form
when moisture from the chinking accumulates in
voids beneath the bead and gets hot from the sun.
Blisters appear as “bubbles” in the material and
vary widely in size.
Shield freshly chinked walls from the sun with
white tarps. If this cannot be done, keep a close
eye on the chinked wall for the first 24-48 hours.
If a blister begins to develop, puncture a hole in
the middle of it, and gently push the material back
into place. 3-5 days later, touch-up the repaired
blister with Chinker’s Edge.
You May Also Need...
Recently Viewed Items... | |